Thermal Power Plants
We were hired by Techint to manufacture, transport and assemble two industrial plants for power generation: one for gas and the other for steam.
In Córdoba Province, fifty kilometers from the capital, is located the town of Pilar. In this locality, DINSA built the combined cycle plant "Gob. Arturo Zanichelli" intended to incorporate its output power (236 MW) to the national interconnected system that began operating at the end of 2009.